Located on I-10 near Iowa, LA at the US 165 interchange, this project consists of the construction of two new bridges on I-10 over US 165. The scope of work includes the construction of a new widened roadway on each end of both bridges, and reconstruction of the ramps and frontage roads.
To minimize traffic delays and the inconvenience to the traveling public on existing I-10, the bridges will be constructed in 50% intervals. The bridge work will consist of removal of existing bridges, drilled shafts, columns, caps, LG-54 & LG -63 girders, concrete decks, concrete bridge rail & concrete approach slabs. The roadway portion of the project will include clearing & grubbing, temporary sheet piles, earthwork, retaining wall, drainage structures, treated subgrade, class II soil cement, class II stone, asphalt concrete pavement and median barriers.
There are currently 23 career opportunities at C7ÓéÀÖ¹Ù·½ÍøÕ¾ Construction Company.